Block Maintenance Contracts in London
Stop paying for the same breakdowns every winter. One programme for the whole block: every HIU serviced before the season, a photographed report per flat, a block summary the directors can approve, and a same-day line when something fails.
Survey fee credited against year one. No charge for flats we cannot access. Block rates that step down.
Mainteniq provides block maintenance contracts for managing agents, right-to-manage companies, freeholders and landlords of residential blocks across Greater London, all 32 boroughs, from our Westminster SW1 base. A block programme covers every heat interface unit, the communal boilers and plant, fan coil units, MVHR, BMS and the statutory certificates on one annual schedule, priced per unit at block rates. Every flat receives a photographed service report and certificate through our reporting app, the block receives a compliance pack and a block summary, and blocks on a programme get priority on our 24/7 same-day emergency line. Engineers hold SAV Advanced HIU Service Engineer certification and REFCOM F-Gas company certification. The first step is a block survey and a per-unit quote within 48 hours, with the survey fee credited against your first year.
Does This Sound Like Your Block?
If three or more of these are true, the block is being run reactively, and a programme will cost less than the next winter does.
- Top-floor flats lose hot water every autumn
- The same three HIUs fail every winter
- Reactive call-outs are the biggest unplanned line in the service charge
- Residents email you, you email a contractor, nothing changes
- The compliance file has gaps and an audit is coming
- The last contractor did half the block and left no record
- Getting an engineer into 80 flats is your problem, not theirs
- Leaseholders want to see what they are paying for
What a Block Programme Changes
Same block, same residents, same budget line. Different outcome.
| Today | On a block programme | |
|---|---|---|
| Heating season | Breakdowns found by residents in the first cold week | Every HIU and the plant serviced before the season; recurring faults listed and budgeted |
| Service charge | Emergency rates, unexpected invoices, questions at the AGM | One fixed annual figure, itemised per unit, agreed before the year |
| Evidence | An invoice and a WhatsApp photo | Photographed report and certificate per flat, block summary for the directors |
| Compliance | Gas safety, F-Gas and TM44 across three contractors or none | One compliance pack, renewal dates tracked, filed with the programme |
| Progress | A spreadsheet nobody trusts | Every flat marked done, no access or follow-up as the programme runs |
| Access | Contractor tries once, gives up on the flats he could not reach | Access plan agreed up front, missed flats rebooked in a mop-up visit |
| Ownership | Plant-room contractor blames the HIU contractor | One contractor from the plant room to the last flat |
How a Block Comes On To a Programme
Six steps. The survey is the only one that needs your time.
- 1
Block survey
Engineer walks the block with you or the concierge, photographs a sample of units and the plant, lists every asset. Per-unit quote within 48 hours.
- 2
Fixed per-unit quote
One annual figure at block rates, itemised. Repairs quoted separately and approved before work.
- 3
Access plan
Your team or the concierge notifies residents, or we send the notices and book the slots. Decided before day one.
- 4
Serviced flat by flat
Around 90 minutes per HIU, plant on the same programme. Progress visible as it runs.
- 5
Reports and block summary
Per-unit reports and certificates through Maintivo, then a block summary for the directors.
- 6
Same-day cover all year
24/7 line, priority for blocks on a programme, the engineer who knows the block.
Four Terms Your Current Contractor Probably Does Not Offer
Moving a block is a risk for the agent. These are written to take the risk off you.
The block survey is deducted from the first year's programme if you sign. A yes costs nothing extra; a no still leaves you with the condition report.
Flats we cannot get into are not billed. The mop-up visit is included in the price, not added to it.
The per-unit price falls as the number of units rises. The structure is in every quote.
Anything beyond the service is quoted separately and signed off by the agent first.
What the Directors See
Every unit is completed in Maintivo on site, so the report is photographed, timestamped and sent the same day. Written for a leaseholder or an auditor, not just an engineer.
- Photos of every unit, before and after
- Flow and return temperatures, differential pressure, hot water delivery time
- Engineer name, SAV certification number, date
- Block summary: done, no access, faults by pattern, replacements in priority order, next due
The Six Questions the Directors Will Ask You
Answers you can forward as they are.
Is this more expensive than what we pay now?
Usually not once call-outs are counted. Most blocks pay for reactive repairs at emergency rates, invoice by invoice, and never add them up. The quote is itemised per unit so the directors can compare it with last year's reactive spend line by line.
What disruption will residents see?
One notified visit per flat, around 90 minutes, booked in a time slot. Residents who miss the slot are rebooked rather than chased. Communal plant is serviced without entering flats.
What if it does not work out?
Twelve-month term with a quarterly summary, so the directors see what was done each quarter rather than waiting a year to judge it.
Who is liable on site?
Mainteniq is SafeContractor approved and REFCOM F-Gas certified. Risk assessments and method statements are provided for the programme, and every engineer on site is named in the report.
Can you work alongside our plant-room contractor?
Yes. Many blocks start with the HIUs only and keep an existing plant contractor. We service what we are asked to and report on the rest, and the block can move the plant across at renewal if it wants one contractor.
What happens when a unit needs replacing?
It appears in the block summary in priority order with a budget indication, so replacements are planned into the service charge rather than discovered at 7am in January.
Everything in the Block, on One Programme
From the plant room to the HIU in the last flat.
Who a Block Programme Is For
Managing agents
One contractor for the block, one report pack, fewer resident emails.
RTM and residents' directors
A fixed figure the AGM can approve, with evidence of what was done in every flat.
Freeholders and portfolio landlords
Several blocks on one programme, block-level reporting for each.
Housing associations and BTR
Suited to estates and schemes that need per-unit records at scale.
Blocks on communal heating, including the Pimlico District Heating Undertaking and the heat networks around Nine Elms, Canary Wharf and Elephant and Castle, are the core of this work. See HIU servicing, BTR maintenance and areas we cover.