Point-to-point · Functional testing · Graphics · Handover · London

BMS Programming and Commissioning Engineers in London

Control strategies, schedules, alarms and graphics written properly, then every point tested, every sequence proven and the building handed over with documents that make sense. For new installations, upgrades, fit-outs and systems that were never commissioned properly.

Call +44 783 456 2366
  • Free site visit in London
  • Every point tested and recorded
  • Backups and documents handed over
Two Mainteniq London engineers commissioning a building management system, testing a valve actuator with a tablet and a laptop in a plant room

What is BMS commissioning?

BMS commissioning is testing and adjusting a building management system so it does what it was designed to do: every sensor reads correctly, every valve, damper and fan responds to its command, every sequence and alarm works, and the system is documented and handed over. BMS programming is writing the control logic behind it: strategies, time schedules, setpoints, alarms, trend logs and the graphics people use.

Mainteniq programmes and commissions building management systems across London and a 120-mile radius, and in Manchester, Birmingham, Leeds and Bristol. We commission new systems, re-commission older ones that have drifted, and commission after BMS upgrades and fit-outs. We also set up the software side, such as analytics and remote monitoring.

What programming covers

BMS Programming: What We Write and Set Up

Good programming is invisible: the building just runs. Bad programming shows up as complaints, high bills and alarms nobody understands.

Mainteniq London engineer commissioning a building management system control panel with a laptop
Strategies loaded, then tested point by point before anything goes live.

Control strategies

What it means: The logic for each piece of plant: boilers, pumps, air handling units, fan coils, heat interface units, chillers and ventilation.

Time schedules

What it means: Occupancy times, holidays and optimum start and stop, so plant runs when the building is used and not otherwise.

Setpoints and limits

What it means: Temperatures, pressures and dead bands set to the design, with limits so they can't be pushed somewhere silly.

Alarms that matter

What it means: Alarms with priorities and sensible delays, sent to the right people, so the real ones are not lost in the noise.

Trend logs

What it means: The right points logged at the right intervals, so faults and waste can be seen in the data later.

Graphics and integration

What it means: Clear plant and floor graphics, and connection to other systems over BACnet or Modbus: meters, heat interface units, lighting and more.

Handed over on paper

Why So Many New Buildings Get a Half-Commissioned BMS

“The building opened six months ago and the BMS has never worked properly.” Facilities teams inherit this all the time.

Commissioning comes last on a project, so it is the stage that gets squeezed when the programme runs late. Point-to-point checks are skipped, sequences are switched on untested, points are left in manual to get through handover, and the graphics show plant that was changed on site. BREEAM Man 04 expects a building to be handed over in automatic, with working graphics and the facilities team trained. We commission to that standard, and we re-commission systems that were handed over without it.

Every point proven

Point-to-point testing from the field device to the front end, recorded, not sampled.

Handed over in automatic

Nothing left in manual override to get through the handover date.

Graphics that match the plant

Screens drawn from what was really installed, checked against the plant on site.

How We Commission a BMS

Each stage is signed off and recorded before the next one starts. Nothing goes live on the graphics until it has been tested.

  1. 1

    Pre-commissioning

    Panels, wiring, power and terminations checked, and the points list agreed before anything is switched on.

  2. 2

    Point-to-point testing

    Every input and output tested from the field device to the front end: right point, right reading, right direction.

  3. 3

    Sensor calibration

    Sensors checked against calibrated instruments, with the readings recorded.

  4. 4

    Functional testing

    Each sequence proven: start and stop, interlocks, safeties, alarms and what happens on a power or sensor failure.

  5. 5

    Witness testing

    Key tests repeated with the client, the consultant or the main contractor watching, and signed off.

  6. 6

    Graphics live

    Graphics and alarms switched on for users only after the points behind them are proven.

  7. 7

    Documents and backups

    Points list, as-fitted drawings, O&M information and a full backup of the programs handed over.

  8. 8

    Training and seasonal check

    Users trained on site, then a return visit in the opposite season to check heating or cooling under real conditions.

Re-commissioning

When an Existing BMS Needs Re-commissioning

Commissioning is not only for new buildings. Most systems drift: settings get changed, plant gets replaced, floors get refitted, and nobody re-tests the whole thing.

Mainteniq London engineer handing over a BMS touchscreen to a facilities manager after commissioning
Handover with training, documents and a full backup.

After a fit-out

New partitions and new fan coils, but the old strategy and the old graphics. Sensors end up in the wrong rooms.

After plant is replaced

A new boiler, pump or air handling unit wired into a strategy written for the old one.

A new owner or managing agent

Taking on a building with no documents and no idea if the BMS was ever commissioned properly.

Complaints that never go away

Too hot, too cold, noisy or stuffy, even though every part has been checked and replaced.

Bills higher than they should be

Energy use well above similar buildings, with plant running longer than anyone thinks.

No backups or files

If a controller fails tomorrow, can its program be reloaded? If nobody knows, that is the first job.

Commissioning an older BMS?

Older systems can usually be re-commissioned without being replaced. If parts are obsolete, we plan a phased upgrade that keeps the field devices and wiring where they are still sound; see BMS upgrades.

Ownership at handover

Passwords, Programs and Licences: Who Owns Them When We Leave

Many of the buildings we take over have no passwords, no project files and software licences held in the installer's name. Every change then needs the original contractor, at their price.

When we commission a system, the building owns it. You receive the passwords, the program backups, the points list and the graphics. Software licences are registered in your name wherever the manufacturer's licence allows it. Some manufacturers tie licences to a dealer or to one computer, so it depends on the system: where a licence cannot be transferred, we tell you at the survey, before you commit.

Passwords and accounts

Administrator access held by the building, with named user accounts for your team.

Backups and points list

Program backups and a points list stored where your team can reach them, not on our laptop.

Licences in your name

Wherever the manufacturer allows it, and in writing where it does not, so there are no surprises.

Remote access agreed

If the system is reached remotely, the route and the named accounts are agreed with your IT team and written down.

Standards and regulations

The Rules and Guides Behind BMS Commissioning

Commissioning to recognised guidance protects the client, the contractor and building control sign-off. These are the ones that apply most often in England.

Building Regulations Part L

Approved Document L (Volume 2, 2021 edition) expects new non-domestic buildings with heating or air conditioning over 180kW to have a building automation and control system. It also applies when such a system is installed or replaced in an existing building over 180kW.

Commissioning notice

Fixed building services must be commissioned by testing and adjusting, under a commissioning plan, and a notice given to building control: within 5 days of completion, or 30 days through a competent person scheme.

CIBSE Commissioning Code C

The CIBSE code for commissioning automatic controls, including building management systems and networked controls. Code M covers commissioning management.

BSRIA guides

BG 8 (model commissioning plan), BG 6 (commissioning record sheets), BG 83 (guide to controls) and BG 54 (Soft Landings, for aftercare after handover).

BS EN ISO 16484 and BS EN ISO 52120-1

The standards for building automation systems and for how much they improve energy performance. BS EN ISO 52120-1 replaced BS EN 15232 and keeps the efficiency classes A to D.

This is a summary, not legal advice. Check the current Approved Document and your building control body for your project.

BMS Platforms We Work On

Modern, older and mixed systems, including buildings where nobody has the passwords or the original files any more.

Trend Tridium Niagara Delta Controls Titan Products Distech ControlsJohnson ControlsSiemensHoneywellSatchwellCylonOlder and obsolete systems

How BMS Commissioning Works With Us

  1. 1

    Free site visit

    We look at the BMS, the panels and the plant it runs. Free in London; in the Home Counties, free for larger jobs, otherwise we quote the visit first.

  2. 2

    Digital report with photos

    What we found, what it means and what to do first, sent by email.

  3. 3

    Clear recommendation

    Explained in plain English and priced as a fixed quote before any work starts.

  4. 4

    Work done and recorded

    Every visit ends with a new report, readings and a fresh backup of the system.

Digital reports, not paperwork

A photographed PDF report after every BMS commissioning

No handwritten job sheets and no chasing. Our engineers complete each job electronically on site in Maintivo, our job management system, so the report is built as the work happens: photos, readings, work done and recommendations.

You receive it as a digital PDF by email the same day, with certificates attached where they apply, ready to forward to a landlord, a freeholder, the directors or an insurer.

  • Before and after photosEvery unit and fault photographed on site
  • Readings and checksTemperatures, pressures and test results recorded
  • Work done and next stepsWhat was fixed, what needs quoting, when we return
  • Sent the same dayDigital PDF report by email, ready to forward

Example layout. Completed on site in Maintivo.

Qualifications Behind Our BMS Commissioning Work

SafeContractor ApprovedMAINTENIQ LTD, SSIP certificate NZ2372
BMS Control Systems trainedInnotech / Uxbridge College: DDC, programming, iComm, fault-finding
REFCOM F-Gas certifiedREF1024168, air conditioning and refrigerant work
SAV Advanced HIU Service EngineerHeat interface units in communal heating
NICEIC Domestic VentilationDV-02 certified
NICEIC certified electriciansElectrical work; gas work by Gas Safe registered engineers

Where We Carry Out BMS Commissioning

All 32 London boroughs, with a free site visit, and a 120-mile radius of the Home Counties, where the visit is free for larger jobs and quoted first for smaller ones. We also take on BMS work in these cities:

Outside London? Send us your BMS details

What customers say on Google

5.0Google rating
“I've had the pleasure of working with Petru and his team on a number of maintenance jobs, and they've always been fantastic. They're professional, reliable, and complete every job to a really high standard. Petru is incredibly knowledgeable and it's clear he takes pride in his work.”

Deborah L.

Google review

“Excellent service. Price assessment: reasonable price.”

Attila B.

Google review

“The team is knowledgeable, efficient, and attentive to detail. A great choice for anyone looking for reliable maintenance services. Highly recommended!”

Ben

Google review

Read all reviews on Google

Talk to Us About Commissioning

In London an engineer comes to see the system and the plant for free; in the Home Counties it is free for larger jobs, and for smaller ones we quote the visit first. You get a digital report with photos and a fixed quote for programming or commissioning, with no obligation to go ahead.

WhatsApp us Call

BMS Programming and Commissioning: Common Questions

BMS commissioning is testing and adjusting a building management system so it works as designed: every sensor reads correctly, every valve, damper and fan responds, every sequence and alarm works, and the system is documented, backed up and handed over. It follows guidance such as CIBSE Commissioning Code C for automatic controls.

Point-to-point testing checks every input and output from the field device all the way to the front end: that each sensor appears on the right point with a sensible reading, and that each output moves the right valve, damper or fan in the right direction. It comes before functional testing, because sequences can't be proven on wrongly wired points.

Writing and setting up the control strategies for each piece of plant, time schedules and holidays, setpoints and limits, alarms with priorities, trend logs, and the graphics people use, plus connecting other systems such as meters and heat interface units over BACnet or Modbus.

In England, Approved Document L (Volume 2, 2021 edition) expects new non-domestic buildings with heating or air conditioning over 180kW to have a building automation and control system, and the same applies when one is installed or replaced in an existing building over 180kW. Below that, centralised controls should be considered. Check the current guidance with your building control body for your project.

Witness testing is repeating key commissioning tests while the client, the consultant or the main contractor watches, so they can sign them off. Typically the most important sequences, alarms and safeties are witnessed.

Yes. Many systems drift after fit-outs, plant replacements and years of changes. Re-commissioning tests the system as it is now, puts sensors and points right, updates graphics and documents, and takes a full backup. It often fixes long-running comfort complaints and high energy use.

A points list, test and commissioning records, as-fitted information, a full backup of the programs and graphics, the passwords and user accounts, software licences in your name wherever the manufacturer allows it, training for your team, and a digital report with photos. We also recommend a return visit in the opposite season to check heating or cooling under real conditions.

Yes. We can commission or re-commission systems installed by others, take over systems where the original installer has gone, and commission after upgrades and fit-outs, on Trend, Tridium Niagara, Delta Controls and other platforms.

Wherever the manufacturer's licence allows it, yes. Some manufacturers tie licences to a dealer or to one computer, so it depends on the system. Where a licence cannot be transferred, we tell you at the survey, before you commit. Passwords, program backups, the points list and the graphics are handed to you in every case.

Usually because commissioning was squeezed at the end of the project: point-to-point checks skipped, sequences switched on untested and points left in manual to meet the handover date. BREEAM Man 04 expects a building to be handed over in automatic, with working graphics and a trained facilities team. We re-commission systems that were handed over without that.

Emergency line. Same-day response across London.

Something broken right now? Speak to an engineer.

A clear price before any work starts, and a written report after. For planned servicing, compliance certificates and contracts, WhatsApp us and we will call you back.

REFCOM certified REF1024168Gas Safe registered engineersSafeContractor approvedNICEIC certified electricians

Emergency HVAC and heating repair in London