Caleffi · SATK22 · SATK30 · SATK32 · London
Caleffi HIU Service and Repair in London
Servicing, repairs and replacement for Caleffi SATK heat interface units, direct and indirect, in London flats, build-to-rent blocks and heat networks, by SAV certified, HIU trained engineers, with a 24/7 HIU call-out line.
- Direct and indirect units
- Free site visit in London
- 24/7 HIU call-out

Who services Caleffi HIUs in London?
Mainteniq services and repairs Caleffi heat interface units across London and the Home Counties, including the SATK22, SATK30 and SATK32 ranges and the mechanical SATK16315. Our engineers hold the SAV Advanced HIU Service Engineer certificate and Herts Energy Academy HIU training, and we follow the maintenance steps in Caleffi's own installation, commissioning and maintenance manuals. Every visit ends with a report with photos and readings, and our emergency line runs 24/7 for no heating or no hot water.
Caleffi is an Italian manufacturer. In the UK its heat interface units are supplied by Altecnic, a Stafford company in the Caleffi Group, so the same unit can carry either name. If your label says Altecnic, see our Altecnic HIU page. For every other make, see HIU service and repair.
How a Caleffi HIU Works
Caleffi describes its SATK units as controlling the heating and hot water of one flat independently, on a central boiler system or a district heat network. Here is the path the heat takes.
- STEP 1
Network water arrives
Hot water from the plant room or district heat network comes in through a mesh strainer and a differential pressure control valve that steadies the supply.
- STEP 2
A tap opens
A flow meter, a small turbine and sensor, detects the hot tap. Hot water takes priority and the controller opens the hot water modulating valve.
- STEP 3
Hot water exchanger
Network heat passes through a brazed plate heat exchanger to the flat's mains water, so hot water is made instantly with no cylinder.
- STEP 4
Heating: direct or indirect
On a direct SATK22 the network water flows round the flat's radiators or underfloor heating. On an indirect SATK30 or SATK32 a second exchanger keeps the two separate.
- STEP 5
Cooled water returns
Cooled water goes back to the network past a return temperature probe. Low temperature SATK22 units also carry a normally closed thermal safety solenoid valve.
Caleffi's controllers also run the pump for a few seconds and move the valves once every 24 hours when they are idle, so they do not seize. Scale and debris can still build up inside, which a service picks up.
Know your unit
Which Caleffi HIU Do You Have?
The SATK code is on the label inside the cover. These are the Caleffi ranges in Caleffi's own manuals and data sheets.
SATK22 (direct, wall-mounted)
Low, medium and high temperature versions. The code shows which: SATK2210x is low, SATK2220x medium, SATK2230x and SATK2240x high, and the SATK2240x adds a primary pump.
SATK30 (indirect, double wall-mounted)
Separate heating water with instant hot water. Caleffi lists the SATK30103HE at 40 kW and the SATK30105HE at 65 kW of hot water.
SATK32 (indirect, wall-mounted)
SATK32103, SATK32105 and SATK32107, the last for low temperature heat networks. Electronic control with Modbus.
SATK16315 (mechanical)
Hot water and high temperature heating with mechanical control, a 30 kPa differential pressure valve, a zone valve and a thermostatic mixing valve made from anti-scale materials.
Direct or indirect?
Direct (SATK22)
Network water runs straight through the flat's radiators or underfloor heating, so the flat's heating shares the network's water.
Indirect (SATK30, SATK32)
A second plate heat exchanger gives the flat its own sealed heating circuit, with its own pump, expansion vessel and pressure gauge.

Common Caleffi HIU Problems and What Causes Them
Caleffi's SATK22 and SATK30 manuals carry a fault table for every symptom. These are the causes they list, and the ones we find most on site.
No hot water
Caleffi's fault tables list closed primary valves, a disconnected or faulty valve actuator, a valve stuck closed, air, a cold network, and a disconnected or faulty hot water flow meter.
Hot water lukewarm
A clogged primary strainer, a partly blocked heat exchanger, a faulty actuator, too many taps open at once, or low temperature or flow from the network.
Hot water too hot
A set point too high, a valve stuck part open, a faulty actuator or controller, or too much pressure on the primary side from the network.
Low or no flow at the tap
First a clogged or completely blocked HIU strainer, then a blocked exchanger, part-closed cold water valves or a weak cold supply in the building.
Rooms not reaching temperature
A clogged strainer, a heating valve actuator or obturator fault, a pump that has stopped or come unplugged, air in the system, or thermostat programming.
Error codes 4, 69 and 76
Code 4 is low heating pressure, often a low expansion vessel pre-charge. Code 69 is the safety thermostat cutting out. Code 76 is a fault on the thermal safety valve of low temperature SATK22 units.
On SATK30 units Caleffi also lists codes 79 and 80 for an incorrect dip-switch setting. A direct SATK22 on underfloor heating with one cold room may have a manifold fault instead: see underfloor heating repair. If the whole block has lost heat, call our 24/7 emergency line and see heat network maintenance.
What we do
Caleffi HIU Services
From a single flat with lukewarm hot water to every SATK unit in a block, by engineers trained in heat interface unit fault finding.

Caleffi HIU service
Strainers and the flow meter turbine cleaned, exchanger checked, expansion vessel pre-charge and pressure set, valves tested, readings and photos in the report.
HIU servicingCaleffi HIU repair
No hot water, lukewarm or scalding hot water, cold rooms, error codes and leaks, traced to the part and repaired. We always aim to fix it on the first visit.
Descaling and heat exchangers
Partly blocked plate heat exchangers cleaned or exchanged with new O-rings, fitted the right way round as Caleffi's manual requires.
Controls, flow meters and valves
Actuators, valve obturators, temperature probes and hot water flow meters replaced, and dip-switch and set point settings checked.
HIU installation and replacement
New and replacement heat interface units installed, commissioned and handed over with readings, where a unit is beyond economic repair.
Whole-block programmes
Every Caleffi unit in a block on one programme, with access arranged, a report per flat and a block summary.
Block contracts6 months
how often Caleffi says to check the expansion vessel
How Often Should a Caleffi HIU Be Serviced?
Caleffi's SATK30 manual says to check the expansion vessel pre-charge at least once every six months, because a low pre-charge trips the heating pressure switch. Its SATK32 instructions set the full list of checks at least once every 12 months, in line with EN 806-5: strainers cleaned, valves checked for leaking through, relief valve and pressures checked, and hot water flow tested at temperature. We service Caleffi units every year and check the vessel at each visit. Caleffi's manuals send spare parts enquiries to Caleffi itself, so we record the full SATK code on every report.
Read more: HIU inspection vs HIU service
24/7 HIU Call-Out for No Heating or No Hot Water
Our emergency line is answered day and night, weekends included. In London we aim to attend the same day. We always aim to fix the fault on the first visit; if a part has to be ordered, the flat is made safe and you get a fixed price first.
How a Caleffi HIU Job Works
- 1
Free site visit
We look at the HIU, the fault LED or display, the riser and the controls. Free in London; in the Home Counties, free for larger jobs, otherwise we quote the visit first.
- 2
Report with photos
Which Caleffi model and temperature class you have, what is working, what is worn and what needs doing.
- 3
Clear price
A fixed price for the repair or service before any work, priced per unit for blocks.
- 4
Planned visits
Annual servicing on an agreed schedule, with the expansion vessel checked as Caleffi advises.
A photographed PDF report after every Caleffi HIU service
No handwritten job sheets and no chasing. Our engineers complete each job electronically on site in Maintivo, our job management system, so the report is built as the work happens: photos, readings, work done and recommendations.
You receive it as a digital PDF by email the same day, with certificates attached where they apply, ready to forward to a landlord, a freeholder, the directors or an insurer.
- Before and after photosEvery unit and fault photographed on site
- Readings and checksTemperatures, pressures and test results recorded
- Work done and next stepsWhat was fixed, what needs quoting, when we return
- Sent the same dayDigital PDF report by email, ready to forward
Example layout. Completed on site in Maintivo.
Qualifications Behind the Work
What customers say on Google
“I've had the pleasure of working with Petru and his team on a number of maintenance jobs, and they've always been fantastic. They're professional, reliable, and complete every job to a really high standard. Petru is incredibly knowledgeable and it's clear he takes pride in his work.”
Deborah L.
Google review
“Excellent service. Price assessment: reasonable price.”
Attila B.
Google review
“The team is knowledgeable, efficient, and attentive to detail. A great choice for anyone looking for reliable maintenance services. Highly recommended!”
Ben
Google review
Book a Free Caleffi HIU Site Visit
In London an engineer comes to see your Caleffi HIU for free; in the Home Counties it is free for larger jobs, and for smaller ones we quote the visit first. You get a report with photos and a fixed price before any work.


