Danfoss · EvoFlat · Termix · London

Danfoss HIU Service and Repair in London

Servicing, repairs and replacement for Danfoss heat interface units in London flats, build-to-rent blocks and heat networks, by manufacturer-approved, SAV certified engineers, with a 24/7 HIU call-out line.

Call +44 783 456 2366
  • Danfoss approved
  • Free site visit in London
  • 24/7 HIU call-out
Danfoss heat interface unit with the cover off in a London flat cupboard, ready for a Mainteniq London service

Who services Danfoss HIUs in London?

Mainteniq services, repairs and replaces Danfoss heat interface units across London and the Home Counties. Our engineers are manufacturer approved for Danfoss and SAV units, Evinox trained and certified, and hold the SAV Advanced HIU Service Engineer certificate. Every visit ends with a report with photos and the readings taken, and our emergency line runs 24/7 for no heating or no hot water.

Danfoss is one of the most common heat interface unit makers in London blocks on communal heating, so many managing agents and residents have one in a cupboard without knowing it. If the label says Danfoss, EvoFlat or Termix, this is the right page. For every other make, see our HIU service and repair page.

How a Danfoss HIU Works

A heat interface unit is the small box that connects one flat to the building's shared heating. It takes heat from the network and turns it into the flat's own hot water and heating, so the flat needs no boiler.

  1. STEP 1

    Heat from the network

    Hot water arrives from the block's plant room or a district heat network, through the flow pipe into the flat.

  2. STEP 2

    Heat meter and valves

    The heat meter records what the flat uses. The control valves, on many Danfoss units a TPC-M controller, let the right amount of heat in.

  3. STEP 3

    Plate heat exchanger

    Inside the HIU, heat passes through a plate heat exchanger to the flat's own water. The network water and tap water never mix.

  4. STEP 4

    Hot water and heating

    Instant hot water at the taps and shower, and heat for radiators or underfloor heating, set by the flat's thermostat.

  5. STEP 5

    Cooler water returns

    The cooler water goes back to the network through the return pipe. A low return temperature is the sign of a healthy unit.

Because tap water and network water never mix, most hot water faults sit at the strainers, the plate heat exchanger or the controller: all inside the HIU, and all serviceable.

Know your unit

Which Danfoss HIU Do You Have?

The model name is on the label inside the cupboard or on the casing. These are the Danfoss names we see most in London flats.

EvoFlat

Danfoss's modular flat station range, including units for heating with instant hot water. Common in London new-build and BTR blocks.

Termix

Danfoss's Termix flat stations and hot water units, found in many communal heating schemes.

Older FlatStation units

Earlier Danfoss heat interface units still running in blocks built over the last fifteen years or so.

Send a photo of your HIU label
Mainteniq London engineer comparing a clogged HIU strainer with a clean one during a heat interface unit service
A blocked strainer next to a clean one: the most common cause of no hot water from an HIU.

Common Danfoss HIU Problems and What Causes Them

Danfoss's own troubleshooting tables point to the same handful of causes we find on site. Most are fixed without replacing the unit.

No hot water

Danfoss's own fault tables start with a blocked strainer on the cold supply or the primary, then low supply flow or pressure. Usually fixed by cleaning and testing.

Lukewarm or slow hot water

A scaled plate heat exchanger, a worn controller or a mixing valve out of setting. Descaling or a part change brings it back.

TPC-M controller faults

The controller that balances hot water against the supply can stick or wear. Danfoss publishes a service kit to exchange it.

Heating will not come on

A failed actuator, a sticking zone valve, a thermostat or wiring fault, or a heating circuit pump that has stopped.

Noise and pressure drops

Air in the system, a failing pump or a high differential pressure from the network. Checked at the HIU and the riser.

Leaks and drips

Perished seals, washers and fittings inside the casing. Caught early, a small leak does not become a ceiling below.

Is only one room cold on underfloor heating fed by the HIU? The fault may be at the manifold instead: see underfloor heating repair. Is the whole block without heat? Call our 24/7 emergency line, and see heat network maintenance.

What we do

Danfoss HIU Services

From a single flat with no hot water to every unit in a block, by engineers who work on Danfoss units every week.

Heat interface unit in a London flat cupboard being serviced by a Mainteniq London engineer
Heat interface unit in a flat cupboard, opened up for its annual service.

Danfoss HIU service

Strainers cleaned, plate heat exchanger checked, controller and valves tested, flow and return temperatures recorded, report with photos.

HIU servicing

Danfoss HIU repair

No hot water, no heating, noise, leaks and controller faults, traced to the part and repaired. We always aim to fix it on the first visit.

Descaling and heat exchangers

Scaled plate heat exchangers descaled or replaced so hot water comes back to temperature.

Controllers and valves

TPC-M controllers, thermostatic and zone valves, actuators and thermostats exchanged with the correct Danfoss parts.

HIU installation and replacement

New and replacement heat interface units installed, commissioned and handed over with readings, where a unit is beyond economic repair.

Whole-block programmes

Every Danfoss unit in a block on one programme, with access arranged, a report per flat and a block summary.

Block contracts

2 years

the longest gap Danfoss allows between inspections

How Often Should a Danfoss HIU Be Serviced?

Danfoss's installation guides say its flat stations should be inspected at least every two years. In London blocks we recommend an annual service: hard water scales plate heat exchangers and blocks strainers faster, and a yearly visit catches a slow hot water complaint before it becomes no hot water. Spare parts are ordered against the unit's serial number, which we record on every report.

Read more: how often should an HIU be serviced?

24/7 HIU Call-Out for No Heating or No Hot Water

Our emergency line is answered day and night, weekends included. In London we aim to attend the same day. We always aim to fix the fault on the first visit; if a part has to be ordered, the flat is made safe and you get a fixed price first.

Call 24/7

How a Danfoss HIU Job Works

  1. 1

    Free site visit

    We look at the HIU, the riser and the controls. Free in London; in the Home Counties, free for larger jobs, otherwise we quote the visit first.

  2. 2

    Report with photos

    Which Danfoss unit you have, what is working, what is worn and what needs doing, sent by email.

  3. 3

    Clear price

    A fixed price for the repair or service before any work, priced per unit for blocks.

  4. 4

    Planned visits

    Annual servicing on an agreed schedule, with a new report every visit.

Digital reports, not paperwork

A photographed PDF report after every Danfoss HIU service

No handwritten job sheets and no chasing. Our engineers complete each job electronically on site in Maintivo, our job management system, so the report is built as the work happens: photos, readings, work done and recommendations.

You receive it as a digital PDF by email the same day, with certificates attached where they apply, ready to forward to a landlord, a freeholder, the directors or an insurer.

  • Before and after photosEvery unit and fault photographed on site
  • Readings and checksTemperatures, pressures and test results recorded
  • Work done and next stepsWhat was fixed, what needs quoting, when we return
  • Sent the same dayDigital PDF report by email, ready to forward

Example layout. Completed on site in Maintivo.

Qualifications Behind the Work

Manufacturer approvedFor SAV and Danfoss units; Evinox trained and certified
SAV Advanced HIU Service EngineerCertificate PERS-30839
HIU trainingHerts Energy Academy heat interface unit training
REFCOM F-Gas certifiedREF1024168
NICEIC Domestic VentilationDV-02 certified
NICEIC certified electriciansGas work by Gas Safe registered engineers

What customers say on Google

5.0Google rating
“I've had the pleasure of working with Petru and his team on a number of maintenance jobs, and they've always been fantastic. They're professional, reliable, and complete every job to a really high standard. Petru is incredibly knowledgeable and it's clear he takes pride in his work.”

Deborah L.

Google review

“Excellent service. Price assessment: reasonable price.”

Attila B.

Google review

“The team is knowledgeable, efficient, and attentive to detail. A great choice for anyone looking for reliable maintenance services. Highly recommended!”

Ben

Google review

Read all reviews on Google

Book a Free Danfoss HIU Site Visit

In London an engineer comes to see your Danfoss HIU for free; in the Home Counties it is free for larger jobs, and for smaller ones we quote the visit first. You get a report with photos and a fixed price before any work.

WhatsApp us Call

Danfoss HIU: Common Questions

Yes. Mainteniq services, repairs and replaces Danfoss heat interface units across London and the Home Counties, including EvoFlat and Termix units and older Danfoss FlatStation models. Our engineers are manufacturer approved for Danfoss and SAV units, Evinox trained and certified, and every visit ends with a report with photos.

Danfoss's own troubleshooting tables list a blocked strainer, low supply flow or cold water pressure, a scaled plate heat exchanger, a faulty controller or thermostat, and a mixing or non-return valve as the usual causes. A blocked strainer is the most common, and cleaning it often brings the hot water straight back. If it does not, the controller or heat exchanger is tested next.

Danfoss's installation guides say its flat stations should be inspected at least every two years. In London blocks we recommend an annual service, because hard water scales the plate heat exchanger and blocks strainers faster, and a yearly visit catches slow hot water before it becomes no hot water.

Yes. Where a unit is beyond economic repair, we install and commission a replacement heat interface unit and hand it over with readings. Most Danfoss faults are repairable, so we check the strainers, heat exchanger, controller and valves first and give you a fixed price for repair or replacement before any work.

The TPC-M is the controller on many Danfoss EvoFlat units that balances the hot water against the flow from the heat network. When it sticks or wears, hot water can become slow, lukewarm or unstable. Danfoss publishes a service kit to exchange it, and spare parts are ordered against the unit's serial number.

Yes. Our emergency line is answered day and night, weekends included. For no heating or no hot water we aim to attend the same day across London, and we always aim to fix the fault on the first visit. If a part has to be ordered, the flat is made safe and you get a fixed price first.

HIU servicing is priced per unit. The price depends on the number of units, access to the flats and whether repairs are needed. Booking all the flats in a block together lowers the cost per flat, and in London the site visit to quote is free.

Mainteniq is an independent heating and building services contractor. Our engineers are manufacturer approved to work on Danfoss and SAV heat interface units, Evinox trained and certified, and we service most other makes found in London communal heating schemes.

Emergency line. Same-day response across London.

Something broken right now? Speak to an engineer.

A clear price before any work starts, and a written report after. For planned servicing, compliance certificates and contracts, WhatsApp us and we will call you back.

REFCOM certified REF1024168Gas Safe registered engineersSafeContractor approvedNICEIC certified electricians

Emergency HVAC and heating repair in London